Sports complex
- Construction technology – steel frame
- Total area – 1 213 sq. m.
- Energy efficiency is not lower than C
- Construction period – 6 month
Functionality
First floor: courts for playing basketball (13x24 meters) and volleyball (18x9 meters), training and equipment rooms.
Second floor: mezzanine.
There is a basement floor, with space for a sports hall, a dressing room and a first aid station, with a separate entrance from the street. This space can serve as a shelter.