Dormitory
- Construction technology – steel frame
- Total area – 5 725 m.sq.
- Number of apartments – 119
- Number of residents – 130
- Energy efficiency is not lower than C
- Construction period – 9 month
Interior decoration
Inclusive space
Planning scheme:
- basement: technical premises, sports hall and laundry;
- first floor: lobby group with lobby, student accommodation blocks;
- second-sixth floors: student accommodation blocks.