Skip links

2-storey building

Finishing
Constructive
  • Construction technology – steel platform
  • Number of platforms – from 16
  • Total area – 1 260 sq. m.
  • Number of apartments – 16 - 24
  • Number of residents – 48 - 64
  • Energy efficiency is not lower than C
  • Construction period – 4 month

Steel platform

One section (entrance) of a residential building with a total area of ​​542 m2 for 7 apartments.

The construction technology of the frame is a prefabricated metal platform. One section consists of 16 platforms. It is also possible to increase the required number of platforms to increase the number of floors in the building.

Apartments on the first floor have a private plot with access to it.

An elevator is provided in the center of the core of the stair-elevator complex to organize the unhindered movement of people with reduced mobility and the elderly. It is possible to build a house without an elevator.

Inclusive space

Inclusively oriented planning in our construction projects involves the creation of spaces that are accessible and comfortable for all people, regardless of their physical capabilities. We strive to provide equal access to all functions and services, taking into account the needs of people with disabilities, the elderly, and people with young children.

Platform approach to planning

Variability of facade decoration

Ми використовуємо файли cookie, щоб зробити ваш досвід на нашому сайті ще кращим. Якщо ви згодні, натисніть "Прийняти всі". Хочете дізнатися більше? Завітайте на сторінку нашої політики конфіденціальності.
Натискай
Тягни